AI workers that keep jobs, claims and compliance paperwork moving, from first call to final retention.

They chase documents, prepare claims and variations, and track permits and expiry dates, then wait for your people to sign.

The Workers page in the Swoop control room, with the construction and trades roles this page describes, each working through its procedures.

How the work runs today.

A trade business runs on the dispatch board and job cards. A builder runs on subcontracts, change orders and a monthly billing date. Much of the office's day goes on chasing: parts that haven't arrived, permits not yet issued, variations nobody signed, claims and pay apps sent back for a missing document, and insurances that expired last week. In many markets, one missed deadline for a notice of non-payment, payment schedule or pay less notice can make a whole claim payable, and retention that nobody claims is often never paid.

  1. Service call to invoice5 steps

    Starts with a call, text, email or web booking, a maintenance visit coming due, or a warranty or recall request.

    Where the time goes: rescheduling, calls asking where the technician is, parts not arrived, and job notes too thin to invoice from.

    1. 1The customer service rep screens the job for urgency and books it in the field service system.
    2. 2The dispatcher assigns a technician by skill, location and priority, and the customer gets an arrival window.
    3. 3Jobs that run long, cancellations and emergencies are moved on the board, and customers are told.
    4. 4The technician works from the job card, raising a purchase order for parts and flagging any permit.
    5. 5The office checks notes, photos and certificates, then batches the invoice or books the follow-up visit.

    Waits on suppliers delivering parts, permits and inspections, and customers being home.

  2. Variations and change orders5 steps

    Starts with an owner asks for a change, a site instruction or RFI answer changes the scope, or an authority orders a change.

    Where the time goes: verbal instructions never written up, work done before sign-off, and arguments about value at the final account.

    1. 1The site supervisor or project manager spots the change and the contracts administrator logs it in the register.
    2. 2The change is priced from tender rates where they fit, or at cost plus margin, with any time impact.
    3. 3A variation notice or change order goes to the client with the description, price and new completion date.
    4. 4The client signs before the work starts, which many contracts and some home building laws, such as California's, require.
    5. 5The agreed amount is added to the contract sum, the next claim and any subcontract variations.

    Waits on the client's signature, the architect or superintendent, and subcontractors' prices.

  3. Progress claims and pay applications5 steps

    Starts with the monthly reference date or billing cut-off, or a subcontractor's claim arriving.

    Where the time goes: claims sent back for format or arithmetic, missing waivers and documents, deadlines for schedules and notices, and chasing late payment.

    1. 1The project manager confirms work done for each line of the contract breakdown or schedule of values.
    2. 2The administrator prepares the claim in the format the contract and builder ask for, with approved variations and supporting documents.
    3. 3It goes in by email, the builder's portal or a progress claim platform before the cut-off.
    4. 4Claims from subcontractors are assessed against work done, variations, back charges and retention.
    5. 5If less will be paid, a payment schedule or pay less notice is served within the deadline, then payment is made.

    Waits on the builder's or owner's assessment, the architect's certificate, and lien waivers or compliance documents from subcontractors.

  4. Subcontractor onboarding and site compliance5 steps

    Starts with a subcontract is awarded, a new worker is due on site, or an insurance certificate, license or safety card is about to expire.

    Where the time goes: several policies per subcontractor with different renewal dates, certificates wrong the first time, and lapses found only after an incident.

    1. 1The compliance officer requests insurance certificates, licenses, tax details and company documents.
    2. 2Safety method statements for the work, such as RAMS in the UK or a SWMS in Australia, are collected and reviewed before work starts.
    3. 3Each worker completes a site-specific induction and their cards and tickets are checked.
    4. 4Everything is recorded in the site safety or induction platform, with expiry dates.
    5. 5Lapsed documents are chased, and site management is told before access is stopped.

    Waits on subcontractors sending documents and brokers issuing certificates.

  5. Permits, inspections and compliance certificates5 steps

    Starts with a job that needs a permit, an inspection stage, or the end of work that needs certifying.

    Where the time goes: work booked before the permit is issued, failed inspections, and certificates lodged late or sent back.

    1. 1The office flags the permit need at booking and the permit coordinator applies through the city, county or council portal.
    2. 2Permit status is tracked and the job is held until the permit is in hand.
    3. 3Inspections are booked with the building department, building control or certifier, and failures are rebooked.
    4. 4The licensed tradesperson completes and signs the compliance certificate, or self-certifies through their scheme.
    5. 5Certificates and approvals are filed and handed to the customer or builder.

    Waits on permit offices, certifiers, inspectors and the licensed person's sign-off.

  6. Retention, defects and warranty5 steps

    Starts with each claim, substantial or practical completion, the end of the defects period, or a homeowner's warranty request.

    Where the time goes: retention claimed late or never, and defects chased across many trades and homeowners.

    1. 1Retention (retainage in the US, holdback in Canada) is deducted from each payment at the contract or legal rate and tracked per contract.
    2. 2Retention due at completion, or each year where the law requires it, is claimed as the contract sets out.
    3. 3Defects and warranty requests are logged, checked against the warranty terms, scoped and scheduled with the responsible trade.
    4. 4Completion is confirmed with the owner and the trade.
    5. 5At the end of the defects period, the rest of the retention is claimed and the final account agreed.

    Waits on the client or superintendent certifying completion, and trades fixing defects.

Who it's for.

  • Residential builders

    From a handful of staff to around 100, with site supervisors and a small office

    Swoop takes on variation notices for signature, stage claims, supplier orders, subcontractor documents, handover packs, and warranty requests scheduled with the right trade.

  • Commercial builders and head contractors

    Main contractors from about 20 staff to a few hundred

    Swoop takes on subcontract tender packages, inductions and safety method statements, claim and pay app preparation, assessing subcontractor claims for your approval, retention or holdback tracking, and lien waiver, CIS or contract payment reporting admin.

  • Specialist subcontractors

    Electrical, mechanical, plumbing, roofing and fit-out firms, from sole traders to a few hundred staff

    Swoop takes on monthly claims and pay apps in each builder's format, compliance documents for every head contractor, preliminary notices and lien waivers where the law uses them, and chasing retention at the right dates.

  • Service and maintenance trades

    HVAC, plumbing and electrical businesses, from owner-operators to multi-branch groups

    Swoop takes on booking confirmations and arrival updates, maintenance agreement visits, parts and purchase orders, permit tracking, job close-out checks and invoices, and recall and warranty jobs.

The workers you'd hire.

Each owns standards, runs your procedures in your apps, and asks a person where your rules say so.

Service coordinator

Keeps every booked job confirmed, supplied, permitted and invoiced, so your dispatcher and technicians can focus on the work.

Standards it owns

  • Every booked job has a confirmation and arrival window sent to the customer, and an update when the technician is running late.
  • Every maintenance agreement visit due next month is scheduled by the 1st.
  • No job that needs a permit is scheduled until the permit is recorded as in hand.
  • Every completed job has notes, photos and any required certificate checked, and an invoice prepared within 1 business day.
  • Every purchase order for parts is confirmed by the supplier, with backorders chased the same day.

What comes in

  • Calls logged by CSRs, booking requests, texts and emails from customers
  • Maintenance agreement visits coming due
  • Supplier confirmations, backorder notices and delivery receipts
  • Permit and inspection notifications from city, county and council portals

What it watches

  • The dispatch board for jobs running late
  • Unscheduled maintenance visits for the month ahead
  • Jobs on hold waiting for parts or permits
  • Completed jobs not yet invoiced

Handoffs

  • Hands invoices and supplier bills to the Accounts and payroll officer.
  • Hands warranty and recall requests on project work to the Contracts administrator.
Procedure

Close out a completed job

  1. 1Open the job in the field service system once the technician marks it complete.
  2. 2Check the job card has notes, photos, parts used and any certificate the work needs.
  3. 3Ask the technician for anything missing.
  4. 4Match parts used to their purchase orders.
  5. 5Prepare the invoice and add it to the batch for the office manager to review.
  6. 6Book any follow-up visit and tell the customer when it is.
Track a permit for an installation5 steps

Track a permit for an installation

  1. 1Notice a job booked with a permit flag.
  2. 2Prepare the permit application from the job details and the licensed contractor's records.
  3. 3Send it to the permit coordinator or license holder to sign and submit.
  4. 4Check the permit portal for the permit's status and record it on the job.
  5. 5Release the job to the dispatch board once the permit is in hand, and book the inspection.

Waits for a person

  • Emergency triage and any safety call, decided by your dispatcher or technician
  • Prices and quotes, set by your people
  • Permit applications, signed by the licensed contractor and submitted by a person by default
  • Certificates of compliance, signed by the licensed tradesperson

Contracts administrator

Gets variations and change orders written up, claims and pay apps in on time, and all retention claimed, so nothing goes unpaid for paperwork.

Standards it owns

  • Every variation is written up and sent to the client for signature before the work it covers starts.
  • Every progress claim or pay application is ready for approval 2 business days before the reference date, with its supporting documents.
  • Every subcontractor claim that will be paid short has a draft notice of non-payment, payment schedule or pay less notice ready for approval 2 business days before the deadline.
  • Every retention amount is claimed within 5 business days of the date it falls due, at completion, each annual release or the end of the defects period.
  • Every defect or warranty request is logged and sent to the responsible trade within 1 business day.

What comes in

  • Site instructions, RFIs and client change requests
  • Subcontractors' payment claims and applications
  • Notices of non-payment, payment schedules, pay less notices and remittances from builders and owners
  • Completion certificates, punch lists or defects lists, and homeowner warranty requests

What it watches

  • Each contract's reference date and claim cut-off
  • Deadlines for notices of non-payment, payment schedules and pay less notices
  • Payment due dates and amounts still unpaid
  • Retention held per contract, and completion, annual release and defects period dates

Handoffs

  • Asks the Subcontractor compliance officer to confirm a subcontractor's file is current before a payment is approved.
  • Hands approved payments to the Accounts and payroll officer.
Procedure

Write up a variation

  1. 1Read the site instruction, RFI answer or client request and log it in the variation register.
  2. 2Ask the project manager for the price and any time impact.
  3. 3Draft the variation notice or change order with the description, price and new completion date.
  4. 4Send it to the project manager to approve.
  5. 5Send it to the client for signature and chase until it's signed.
  6. 6Add the signed variation to the contract sum, the next claim and any subcontract variations.
Prepare the monthly claim6 steps

Prepare the monthly claim

  1. 1Ask the project manager to confirm work done for each line before the cut-off.
  2. 2Build the claim or pay application from the contract breakdown, adding approved variations and stored materials the contract allows.
  3. 3Check the totals reconcile and the format matches what the builder or owner asks for.
  4. 4Attach the supporting documents the contract needs, such as lien waivers, a statutory declaration or a supporting statement.
  5. 5Send the claim to the person who serves claims for approval.
  6. 6Once approved, prepare it in the builder's portal or email for them to submit, and record the due date for payment.
Assess a subcontractor's claim4 steps

Assess a subcontractor's claim

  1. 1Log the claim and work out the deadline for a notice of non-payment, payment schedule or pay less notice under the contract and the law.
  2. 2Compare it with the project manager's view of work done, approved variations, back charges and retention.
  3. 3Draft the notice, with every reason and how the amount was worked out.
  4. 4Send it to the contracts manager to approve and serve before the deadline.

Waits for a person

  • Pricing and agreeing every variation, decided by your people and signed by the client
  • Serving payment claims and every notice of non-payment, payment schedule or pay less notice, which wait for a person by default
  • Signing lien waivers, statutory declarations and supporting statements
  • Starting adjudication, a lien claim or any dispute

Subcontractor compliance officer

Keeps every subcontractor's insurance, licenses, inductions and safety method statements on file and current, so your site team only deals with exceptions.

Standards it owns

  • No subcontractor starts on site without current insurance, licenses and a reviewed safety method statement on file.
  • No worker is on site without a recorded induction.
  • Every insurance certificate, license and safety card on file has a renewal request sent 30 days before it expires.
  • Every certificate of insurance is checked against the subcontract's requirements within 2 business days of arriving.

What comes in

  • Subcontract awards from the Contracts administrator
  • Certificates, licenses and safety method statements from subcontractors and brokers
  • Induction completions and new starters from the site team

What it watches

  • Expiry dates for every insurance certificate, license and safety card
  • Start dates in the next two weeks and their open documents
  • Workers booked on site without a recorded induction

Handoffs

  • Confirms to the Contracts administrator that a subcontractor's file is current before payment.
  • Hands new subcontractors' tax details to the Accounts and payroll officer, such as W-9s in the US, CIS verification in the UK or T5018 records in Canada.
Procedure

Onboard a new subcontractor

  1. 1Read the subcontract award and list the documents the contract and site need.
  2. 2Request insurance certificates, licenses, tax details and company documents.
  3. 3Check each certificate's insurer, limits, dates and named parties against the requirements.
  4. 4Request the safety method statement for the work, such as RAMS or a SWMS, and send it to the site manager to review.
  5. 5Send induction invites to each worker and record completions in the safety platform.
  6. 6Mark the file complete, or tell the site manager what's still missing before the start date.
Chase an expiring document4 steps

Chase an expiring document

  1. 1Notice a document due to expire in the next 30 days.
  2. 2Ask the subcontractor or their broker for the renewal.
  3. 3Chase weekly and tell the site manager if it's still missing 7 days before expiry.
  4. 4Record the new document and its expiry date.

Waits for a person

  • Approving safety method statements, and every other safety decision, made by your site manager or principal contractor
  • Accepting a subcontractor onto the job
  • Stopping work or refusing site access

Accounts and payroll officer

Matches supplier bills, gets timesheets in before payroll, and keeps subcontractor tax records, lien waivers and payment records straight.

Standards it owns

  • Every supplier invoice is matched to its purchase order and delivery within 5 business days, with differences queried.
  • Every timesheet for the pay period is submitted and approved before the payroll cut-off.
  • No subcontractor is paid without a current compliance file and a lien waiver or clearance certificate where the contract or law needs one.
  • In the UK, the CIS monthly return is ready for approval by the 15th, and deduction statements go out within 14 days of the tax month end.

What comes in

  • Supplier invoices and statements
  • Timesheets and payroll exceptions
  • Approved payments from the Contracts administrator
  • Lien waivers and remittances

What it watches

  • Supplier invoices waiting on a PO match
  • Missing timesheets before each cut-off
  • CIS deadlines on the 19th and 22nd (UK)
  • Waivers and clearance certificates still owed against payments made

Handoffs

  • Receives invoices and parts bills from the Service coordinator and approved payments from the Contracts administrator.
Procedure

Match a supplier invoice

  1. 1Read the invoice from the supplier's email or portal.
  2. 2Find the purchase order and delivery receipt for the job.
  3. 3Compare quantities and prices, and note partial deliveries or credits owed.
  4. 4Query any difference with the supplier and put the invoice on hold.
  5. 5Post matched invoices to the job for the payment run approval.
Prepare the CIS month5 steps

Prepare the CIS month

  1. 1List every subcontractor paid in the tax month.
  2. 2Check each one's verification status and prepare any new verification for a person to submit.
  3. 3Check the labor and materials split and the deduction rate on each payment.
  4. 4Draft the deduction statements for each subcontractor.
  5. 5Prepare the monthly return for the accounts manager to review and submit by the 19th.

Waits for a person

  • Approving payroll and every payment run
  • Submitting the CIS return and verifications, which wait for a person by default
  • Deciding a worker's employment status

Two cases, start to finish.

How a worker takes each one from the first message to done, built from how this work really runs.

A 25-person plumbing and HVAC business in Denver, Colorado, doing service work and small jobs for builders.

A water heater replacement, from call to inspection

  1. Monday 8:10 a.m.A homeowner, Grace, calls about a failed water heater. Ben, the customer service rep, books a replacement for Wednesday, flags it for a permit, and the Service coordinator sends Grace a confirmation with the arrival window.
  2. Monday 9:00 a.m.The worker raises a purchase order for the unit with the supplier and gets a delivery confirmation for Tuesday afternoon.
  3. Monday 11:30 a.m.The worker prepares the permit application from the job details. Luke, the licensed plumber, checks it and submits it, and the worker records the permit on the job.
  4. Tuesday 3:00 p.m.The delivery receipt shows the unit arrived. With the permit in hand, the worker marks the job ready on the dispatch board.
  5. Wednesday 10:40 a.m.The previous job runs long. Dana, the dispatcher, moves the job back an hour and the worker texts Grace the new window.
  6. Wednesday 2:15 p.m.Luke finishes the install. The worker sees the photos are missing from the job card and asks him for them.
  7. Wednesday 4:00 p.m.With photos in, the worker prepares the invoice and requests the permit inspection. Dana reviews the invoice and approves it.
  8. ThursdayThe worker matches the supplier's invoice to the purchase order and passes it to the Accounts and payroll officer.

Dana set the schedule and approved the invoice. Luke, as the licensed plumber, checked and submitted the permit application and did the work. The worker handled the bookings, updates, parts, checks and paperwork, and every step is on the case record.

A 40-person commercial fit-out contractor in Manchester, England, paying about 15 subcontractors a month under CIS.

A subcontractor's application for payment, with a pay less notice

  1. Day 1A dry-lining subcontractor applies for payment. The Contracts administrator logs it and works out the payment due date and the pay less notice deadline from the subcontract.
  2. Day 2The Subcontractor compliance officer confirms the subcontractor's insurance and RAMS are current.
  3. Day 3Priya, the quantity surveyor, values the work lower because one floor isn't finished. The worker drafts the pay less notice with the basis of her calculation.
  4. Day 4Priya approves the notice and serves it, two days before the deadline.
  5. Payment runThe Accounts and payroll officer applies the CIS deduction to the labor part, prepares the payment for Tom, the finance manager, to approve, and drafts the deduction statement.
  6. By the 15thThe worker prepares the CIS monthly return. Tom reviews it and submits it before the 19th.

Priya valued the work and served the notice, and Tom approved the payment and submitted the return. The workers kept the dates, checked compliance, drafted the documents and kept the record.

Work with the businesses you deal with.

Most construction admin waits on another business: the builder assessing a claim, a subcontractor sending insurance, a supplier confirming delivery. With Swoop Connect, workers at verified businesses can exchange claims, compliance documents and status in a shared deal room. A binding step, like agreeing a variation, serving a payment schedule or signing a lien waiver, always waits for a person on the side making it.

  • Builders and head contractors Bid invitations, subcontracts, site instructions, change orders, monthly claims and pay apps, notices of non-payment, payment schedules or pay less notices, retention.

  • Subcontractors and trades Prices, insurance certificates, licenses, safety method statements, induction records, claims, invoices and lien waivers.

  • Suppliers and merchants Quotes, purchase orders, delivery confirmations, invoices, credits and statements.

  • Owners, developers and their architects or superintendents Head contract claims, certificates of payment, change orders, completion certificates and defects lists.

  • Insurance brokers Certificates of insurance, endorsements and renewals.

In a deal room

  1. Before the cut-offAn electrical subcontractor's worker posts its renewed insurance certificate and next month's claim to the deal room it shares with the builder.
  2. Same dayThe builder's compliance worker checks the certificate against the subcontract and marks the file current.
  3. Within daysThe builder's contracts worker compares the claim with the project manager's assessment and drafts a notice of non-payment for one disputed line.
  4. ApprovalThe builder's contracts manager approves and serves the notice. Serving stays with a person.
  5. VariationBoth workers write up the agreed extra work as a variation, and a person on each side signs it.
  6. PaymentThe builder pays, and the subcontractor's worker records the payment and prepares any waiver for its own person to sign.

Your rules, your people, your record.

Safety decisions and sign-offs always stay with your people: approving safety method statements, stopping unsafe work and your duties as principal or general contractor. So does certification by licensed tradespeople, design and engineering judgment, pricing and tenders, agreeing variations, serving payment claims and notices, and any lien, dispute or adjudication. Swoop's workers do the admin around these decisions: collecting, checking, chasing, preparing and recording.

Always stays with your people

  • Safety decisions and sign-offs, including approving safety method statements and stopping work
  • Design and engineering judgment
  • Certification by licensed people, such as compliance certificates and self-certification
  • Prices, quotes and tenders submitted
  • Agreeing variations and change orders
  • Serving payment claims, notices of non-payment, payment schedules and pay less notices, and signing lien waivers
  • Disputes, adjudication and lien claims
  • Approving payroll and payment runs, and deciding employment status

How control works

  • Approval rules decide which steps wait for a person. By default that includes every claim, notice, permit application, tax return and message to a regulator, permit office or other party that might carry legal weight.
  • Each procedure earns autonomy from its track record, and a person decides every step up.
  • Every case keeps its evidence: the documents collected, the dates worked out, the drafts and who approved what and when. That supports the records regulators, auditors and adjudicators ask for.
  • Workers log in to permit portals, tax authority services such as HMRC's CIS service, builders' payment portals and supplier accounts using logins your team sets up for them, where each portal's terms allow it. Passwords stay in the Mac's Keychain and the AI never sees them.

By market

United States
State licensing boards license contractors and trades. Preliminary notice and lien waiver rules vary by state, and some states require statutory waiver forms. Home improvement laws in some states, such as California, require change orders in writing and signed before the work. AIA-style pay applications are industry practice. Employers keep OSHA injury records and FLSA payroll records, and federally funded work needs weekly certified payroll.
United Kingdom
The Construction Act requires payment notices and pay less notices on time, bans pay-when-paid clauses and gives a right to adjudication. Contractors verify subcontractors under CIS, make deductions and file monthly returns by the 19th, and most construction services use the VAT domestic reverse charge. Under CDM 2015 the principal contractor plans the construction phase and makes sure everyone is inducted. The Building Safety Act adds dutyholder duties.
European Union
The Late Payment Directive limits payment terms between businesses to 60 days unless expressly agreed and not grossly unfair, and public authorities to 30 days in most cases, with statutory interest and at least 40 euros in recovery costs. The Construction Sites Directive requires a health and safety plan before work starts, safety coordinators where several firms share a site, and prior notice for larger sites. Many member states apply a VAT reverse charge to construction services.
Canada
Prompt payment laws in Ontario and Alberta, and for federal projects, start a 28-day clock from a proper invoice, require a notice of non-payment or dispute within 14 to 21 days, and give 7 days to pay down the chain, with adjudication for disputes. Ontario requires a 10% holdback, now released each year on newer contracts. Ontario contractors check WSIB clearance certificates, and construction businesses report subcontractor payments to the CRA on T5018 slips.
Australia
Security of payment laws in each state give a right to progress payments. In New South Wales a payment schedule must reach the claimant within 10 business days, with every reason for paying less, or the full claim becomes payable. Queensland adds project and retention trust accounts for eligible contracts. A SWMS must be in place before high-risk construction work starts, and domestic building variations must be in writing and signed before the work.

This describes how Swoop fits around the rules. It isn't legal or compliance advice.